- Capacity
- 357 kWp
- System
- Hybrid
- Location
- Jiftlik
- Period
- 2022
- Duration
- 3 months
Scope of work
Supply, installation and operation of a hybrid / off-grid system to run water pumps for seven artesian wells, with a total capacity of 357 kWp.
Planning a solar project?
Send us your site location and monthly consumption. Our engineers will come back with a sizing proposal.