- Capacity
- 200 kWp
- System
- On-grid
- Location
- Mas-ha, Salfit
- Period
- 2021
- Duration
- 5 months
Scope of work
Design, supply, construction, testing and commissioning of a 200 kWp rooftop grid-connected PV system on the PALSTEEL factory.