- Capacity
- 305.9 kWp
- System
- On-grid
- Location
- Jiftlik, Jericho
- Period
- April - July 2023
- Duration
- 3 months
Scope of work
Design, supply, delivery, installation, testing and commissioning of rooftop PV on the factory's metal-roof hangars, in a zero-export configuration: the system covers the factory's own load and does not export surplus energy to the grid.