- Capacity
- 408 kWp
- System
- On-grid
- Location
- Bethlehem
- Period
- 2020
- Duration
- 3 months
Scope of work
Design and construction of a 408 kWp grid-connected PV system on a stone factory in Bethlehem.
Planning a solar project?
Send us your site location and monthly consumption. Our engineers will come back with a sizing proposal.