- Capacity
- 122 kWp
- System
- Hybrid
- Location
- Jiftlik
- Period
- 2021
- Duration
- 3 months
Scope of work
Supply, installation and operation of a hybrid / off-grid system to run water pumps for artesian wells, with a total capacity of 122 kWp.