- Capacity
- 100 kWp
- System
- On-grid
- Location
- Thenabeh, Tulkarm
- Period
- 2021
- Duration
- 3 months
Scope of work
Design, supply, delivery, installation and commissioning of a 100 kWp rooftop grid-connected PV system at the Al-Sedeeq groundwater well.
Planning a solar project?
Send us your site location and monthly consumption. Our engineers will come back with a sizing proposal.